HC-Mold Maker, A professional injection mold maker provide plastic and rubber mold making and plastic and rubber parts molding service for many year with high quality and low cost and short lead time.
CONTACT US

We reply you within 12hours!
We make the quotations within 24 hours!
HC-Mold (Plastic & Metal) International Co., Ltd.
Tel: +86-769-85327002;  +86-769-23566161

Fax: +86-769-85391842
Email: [email protected]
    [email protected]
Massager:

CALL ME

 

aluminum pressure die casting

General Features:
 
1.Quality Management: ISO9001:2008 & TS16949
2.Molding Material: Aluminum alloy, A360, A380, ADC 10, ADC 12, ZL102, ZL104, iron, brass, copper zinc etc
3.Tolerance: 0.02mm
4. Advantage: High quality, low prices, fast turnaround
5. Application: Quality mass production for your new product development, such as Household appliances, kitchenware, transportation tool, digital & telecommunication products, toys, custom products, auto parts, etc.
 
Plastic and metal parts life comes from HERE��
 Process:
Sand casting, investment casting, die casting, permanent mold casting
Mold Cavity:                      
Single, Mult, Family
Molding Material:
Aluminum alloy, A360, A380, ADC 10, ADC 12, ZL102, ZL104, iron, brass, copper zinc etc
Surface finish:
Electro-polish, Chrome plating, sandblasting, painting, powder coating, electrophoresis etc
Applicable Industry:
Auto parts, motor shell, pump parts, machinery parts,lamp chimney etc.
Design software:
PRO/E.Solidwork,UG.Moldflow.Autocad,etc
Mold Standard:
JIS, DIN, ASTM, BS
Mold Life:
10,000~100,000cyces according to your requests
Production Weight:
  0.5kg--50kg
Lead time to T1 sample:
 2~4 weeks
lead-time for production:
 1~2 weeks
Quality:
 ISO 9001:2000
Precision:
 0.005mm
Service:
 OEM &ODM service.
 
Tooling and Injection Molding Sampling Show:
 
A short overview of HC-Mold's activities:
 
1.     Rapid Prototype Making
CNC, SLA(Stereolithography) and SLS(Selective Laser Sintering), 4~7days lead time.
 
2.     (Export) Mold Making and (Un-Export) Mold
We export Molds for problem-free use, and also make economical molds for use in China-we also have the injection machines for molding production.
 
3.     Parts Production, Final Assembly, Testing and Packaging
To further reduce your cost we produce plastic and metal parts in China further. Assembly is generally the most labor intensive step in the production process, so this is really where we can save you a lot as well.
 
For RFQ,
please contact with us at any time.