CONTACT US
We reply you within 12hours!
We make the quotations within 24 hours!
HC-Mold (Plastic & Metal) International Co., Ltd.
Tel: +86-769-85327002; +86-769-23566161
Fax: +86-769-85391842
Email: [email protected]
[email protected]
Massager:
heap rapid injection tooling for low volume production
General Features:
1.Quality Management: ISO9001:2008 & TS16949
2.Molding Material: abs,pc,pmma,pe,pp,pa66,rubber,pp,silicone,aluminum,iron,zinc, etc.
3.Tolerance: 0.005mm
2.Molding Material: abs,pc,pmma,pe,pp,pa66,rubber,pp,silicone,aluminum,iron,zinc, etc.
3.Tolerance: 0.005mm
4. Advantage: High quality, low prices, fast turnaround
5. Application: Quality mass production for your new product development, such as Household appliances, kitchenware, transportation tool, digital & telecommunication products, toys, custom products, auto parts, etc.
Plastic and metal parts life come from HERE?-
Mold Base: |
LKM,HASCO,DME,etc. |
Mold Cavity: |
Single, Mult, Family |
Molding Material: |
abs,pc,pmma,pe,pp,pa66,rubber,pp,silicone,aluminum,iron,zinc, etc. |
Color: |
transparent, solid color according to your requests |
Surface: |
textured, glossy or mirror polished, printing, planting, anodize, electroplating, electroforming ect. |
Design software: |
PRO/E.Solidwork,UG.Moldflow.Autocad,etc |
Mold Material: |
S45C, P20, 718, 718H, 2738, 738H, NAK80, SKD61, E420, etc. (for reference only) |
Mold Life: |
300,000~1,000,000cyces according to your requests |
Runner: |
Cold, hot runner such as YUDO.MASTER.SYNVENTIVE.etc. |
Lead time to T1 sample: |
3~5 weeks |
lead-time for production: |
1~2 weeks |
Quality: |
ISO 9001:2008/TS16949 |
Tolerance: |
0.005mm |
Service: |
From Rapid prototyping, tooling, molding production to final assembly and packing. |
Tooling and Injection Molding Sampling Show:
A short overview of HC-Mold's activities:
1. Rapid Prototype Making
CNC, SLA(Stereolithography) and SLS(Selective Laser Sintering), 4~7days lead time.
2. (Export) Mold Making and (Un-Export) Mold
We export Molds for problem-free use, and also make economical molds for use in China-we also have the injection machines for molding production.
3. Parts Production, Final Assembly, Testing and Packaging
To further reduce your cost we produce plastic and metal parts in China further. Assembly is generally the most labor intensive step in the production process, so this is really where we can save you a lot as well.
For RFQ,
please contact with us at any time.